Generation
Posted By OrePulse
Published: 22 Apr, 2025 06:53
Iraq breaks ground on 921MW Nasiriyah CCGT plant
Iraq announced on Monday the commencement of construction of the 921-megawatts (MW) Nasiriyah Combined Cycle Gas Turbine (CCGT) power plant in Dhi Qar Province.
The hydrogen-ready plant, awarded to Siemens Energy, will be built within the existing Nasiriyah Thermal Power Station.
The power plant is one of three major development projects inaugurated by Prime Minister Mohammed Shia’ Al-Sudani, with a combined investment value of 2.2 trillion Iraqi dinars (approximately $1.68 billion). The other two projects include the Nasiriyah Integrated Medical City, a 700-bed hospital complex, and infrastructure works in the Suq Al-Shuyukh district.
Related Articles
Trending News
Precious Metals
Turkey central bank data shows 31 tonnes of gold returned to reserves...
24 Apr, 2026 12:52
56 min read
Mining Other
Malawi says gold sold for fuel was bought from small-scale miners, not reserves...
24 Apr, 2026 12:46
57 min read
Energy Other
Angola’s Q1 Oil Revenues Rise on Price Surge – But Volume Declines Signal Structural Risk...
24 Apr, 2026 11:53
64 min read