Search News

Rail


Posted By OrePulse
Published: 25 Nov, 2026 10:30

Lobito railway completes first integrated DRC copper export run

Lobito railway completes first integrated DRC copper export run

By: OrePulse

The Lobito Atlantic Railway (LAR) said it completed its first fully integrated copper export operation between November 9 and 16, moving 12,143 tonnes of copper cathodes from the Kolwezi region of the southern Democratic Republic of Congo to Angola's Port of Lobito, where the cargo was loaded directly onto a bulk carrier for shipment to international markets.

The copper crossed the border from the DRC into Angola and traveled on to Lobito using two separate railway networks and a total of 20 trains, according to LAR. At the port, the cathodes passed through the Mineral Terminal before being loaded onto the vessel.

LAR said the operation marked the first time it had managed the entire logistics chain itself, from the mine region in the DRC through to vessel loading at Lobito, rather than handling only the rail segment of the journey. The company presented the run as evidence that the Lobito Corridor can compete with established export routes used to move copper out of the Copperbelt region.

The corridor links the copper-producing areas of southern DRC and northwestern Zambia with Angola's Atlantic coast via the Benguela Railway, offering a westward alternative to the southern and eastern export routes that Copperbelt producers have traditionally relied on. The route still requires further investment and higher freight volumes before it can become a major channel for mineral exports.

Related Articles