Precious Metals

Epiroc Secures £12 Million Mining Equipment Order for Ghana’s Chirano Gold Mine

Epiroc AB has secured a significant US$12 million order from Canadian mining company Asante Gold Corporation for advanced mining equipment and digital solutions destined for the Chirano Gold Mine in southwestern Ghana. This substantial investment represents a major technological upgrade for the mining operation, which combines both underground and open-pit extraction methods.
Core Equipment Package Components
The comprehensive equipment fleet includes several key machine categories designed to modernize operations:
- Minetruck MT65 S haulers – Heavy-duty underground trucks engineered for efficient ore transportation
- Scooptram ST18 S loaders – Advanced material handling equipment for underground operations
- Boomer M20 S face drilling rigs – Specialized equipment for development drilling
- Simba E70 S production drilling rigs – Precision drilling systems for operational extraction
All equipment belongs to Epiroc's Smart series, featuring automation-ready technology that enables future technological enhancements.
Digital Solutions Transforming Mining Operations
Beyond physical equipment, the order includes sophisticated digital mining operations designed to revolutionize operational awareness through:
- Real-time performance tracking of all connected equipment
- Production data monitoring including tonnage moved and cycle times
- Drilling metrics analysis with detailed measurement of meters drilled
- Safety enhancement features through improved operational awareness
- Efficiency optimization tools that identify bottlenecks
Strategic Importance for Ghana's Mining Sector
This substantial investment highlights several important trends in Ghana's evolving gold mining landscape:
- Technological modernization of established mining operations
- Shift toward automation-ready systems that can evolve with operational needs
- Enhanced safety protocols through improved equipment and monitoring
- Productivity improvements via digital integration
- Sustainable mining practices through more efficient resource extraction
Deployment Timeline
The delivery follows a structured implementation schedule:
- Initial deliveries commenced in Q3 2025
- Continued implementation scheduled over subsequent months
- Integration with existing operations to minimize production disruptions
- Full operational capacity expected following complete deployment
Technical Specifications
The Smart Series equipment features:
- Automation readiness: Pre-equipped for autonomous operation
- Digital integration: Connected to mine-wide monitoring systems
- Precision drilling control: Advanced computerized systems for accuracy
- Enhanced operator protection through improved cabin design
- Real-time performance tracking and diagnostics
This investment represents one of the larger mining technology investments in West Africa in recent years, positioning Ghana as a technologically progressive mining jurisdiction and setting benchmarks for other regional operations considering similar upgrades.